Client: Parker District
- Location:
- Greenville, SC
- The Main Fire Station of Parker Fire District is currently housed in a 1950’s building that has been expanded through the years to accommodate incremental growth of the department. The District determined that the existing facility had outlived its useful life and should be replaced. The District chose DP3 Architects to guide them through the planning and design process for a new main station.
The facility is a two-story, 20,000 square foot structure which will include:- Four drive-through fire apparatus bays
- Cascade room, equipment and gear storage, and de-con area
- Administrative offices
- Classroom space
- Dorm/living quarters
- Exercise area
- Emergency electrical power generation system
Although the District is not pursuing LEED certification of the facility they are opting to incorporate sustainable design principals, materials, and building systems where practical, into the building design.



