Parker District Fire Station HQ
Greenville, SC
The District determined that the existing facility had outlived its useful life and should be replaced. The District chose DP3 Architects to guide them through the planning and design process for a new main station. The facility is a two-story structure which includes: Four drive-through fire apparatus bays, Cascade room, equipment and gear storage, and de-con area, Administrative offices, Classroom space, Dorm/living quarters, Exercise area, and an Emergency electrical power generation system. Although the District chose not to pursue LEED certification of the facility, they did choose to incorporate sustainable design principals, materials, and building systems where practical, into the building design.